February 26, 2015
Gravel was brought in to fill in and top the circular drive at the picnic area, however, some tree trimming had to be done before the large equipment could work the road.
Gravel was laid on the main parking lot, rolled to pack it down . . . . . .
. . . . . . . sprayed with water, rolled again, sprayed again, then rolled again.
Meanwhile, out on Riverside Drive, a crew armed with chainsaws and machetes cleared vegetation from around the bollards.